Texas Drainage Criteria Directory
Where Texas cities, counties and agencies publish their drainage criteria, with the edition each publisher shows.
Each link opens the publisher’s own site. Last checked November 4, 2026. This directory does not say which document applies to a project. A publisher can change a document at any time, so confirm the current edition and any local amendments with the reviewing agency.
Cities
| Jurisdiction | Document | Edition, as shown | Note |
|---|---|---|---|
| City of San Antonio | Storm Water Design Criteria Manual | Not confirmed | The city page links a January 2016 manual and an Atlas 14 amendment revised April 2019. A city checklist refers to a January 2022 edition. Confirm the current edition with the city. |
| City of Austin | Drainage Criteria Manual | Not shown on the page | The city page links to the manual on Municode, where its edition is shown. |
| City of Houston | Infrastructure Design Manual | Effective March 2, 2026 | Chapter 9 is Stormwater Design Requirements. The city page describes which plans follow which edition. |
| City of Dallas | Drainage Design Manual | September 2019 | The city page also lists the 1993 manual. |
| City of Fort Worth | Stormwater Criteria Manual | In effect from July 15, 2024 | The city page also links the 2015 manual. |
| City of Corpus Christi | Infrastructure Design Manual | March 2022 | Chapter 3 is Stormwater Design Requirements. The department also posts a draft Drainage Design Manual appendix dated December 2024. |
Counties
| Jurisdiction | Document | Edition, as shown | Note |
|---|---|---|---|
| Harris County | Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure | Adopted December 18, 2018; updated October 10, 2023 | The county page also lists a September 1, 2023 version for use with the 2017 Standards and Specifications. |
| Bexar County | Flood Damage Prevention Court Order Floodplain regulation | Effective August 22, 2023 | A floodplain regulation, not a drainage manual. We did not find a separate county drainage manual. |
| Bexar County | Bexar County Regulations for Storm Water Pollution Prevention Water quality | Passed November 18, 2025 | |
| Travis County | Chapter 482. Travis County Development Regulations | Amendments through October 28, 2025 | The county subdivision page points drainage designs to the City of Austin Drainage Criteria Manual. |
| Fort Bend County | Drainage Criteria Manual | Revised 2011 | The page also lists an Interim Atlas 14 manual (effective January 1, 2020, updated September 2021) and a draft manual not in force until adopted. |
| Montgomery County | Montgomery County Drainage Criteria Manual | Adopted August 26, 2025; amended September 17, 2026 |
Flood control districts and regional agencies
| Jurisdiction | Document | Edition, as shown | Note |
|---|---|---|---|
| Harris County Flood Control District | 2019 Atlas 14 Policy Criteria and Procedures Manual | Not shown on the page | 2019 is in the title; the page shows no other date. |
| Harris County Flood Control District | Hydrology and Hydraulics Guidance Manual | Not shown on the page | |
| North Central Texas Council of Governments | iSWM Criteria Manual | December 2009, revised January 14, 2015 | The page marks this version current and earlier ones legacy. |
State agencies
| Jurisdiction | Document | Edition, as shown | Note |
|---|---|---|---|
| Texas Department of Transportation | Hydraulic Design Manual | Revised September 2019 | |
| Texas Commission on Environmental Quality | Complying with the Edwards Aquifer Rules: Technical Guidance on Best Management Practices (RG-348) Water quality | Revised July 2005 | The page also lists 2009 errata and 2017 and 2018 addenda. |
Where to read four common items
For the documents we have read: design frequency, detention release, minimum time of concentration and street spread, each with the section to read. These are short summaries in our words, not the rule itself, and most of these rules have exceptions by road class, area or date. Read the section. Other documents above were not read for this.
City of San Antonio: Storm Water Design Criteria Manual January 2016 text; see the edition note above
- Design frequency
- Storm drains: ultimate 25-year under 100 ac of cumulative area, ultimate 100-year above it, with the grade lines below the gutter and top of curb. (§7.3.1, p. 7.15)
- Detention release
- New development at or below predevelopment peaks for the 5-, 25- and 100-year, except as provided in §4.3.1. Redevelopment at or below existing conditions. (§4.3.7, §4.3.8, p. 4.6)
- Minimum time of concentration
- For the overland segment only, not total Tc: 5 to 20 minutes. (§5.4.1, p. 5.3)
- Street spread or ponding
- By road class. Arterials keep one lane each way passable, 0.30 ft in that lane in the 25-year ultimate. (§6.2.1, pp. 6.1-6.2)
City of Dallas: Drainage Design Manual September 2019 manual
- Design frequency
- 1% annual chance storm for streets, inlets and laterals. Alleys contain it within the pavement. (§3.2, p. 22; §3.6.3)
- Detention release
- No increase in peak discharge or erosive velocity against existing conditions, for the 1%, 2%, 10% and 50% annual chance storms. Small infill and some roadway outfalls are exempt; a downstream assessment changes the storms. (§2.3.1, p. 16; Table 2.2)
- Minimum time of concentration
- A computed Tc under 10 minutes is taken as 10 minutes. (§2.2.1.3, p. 10)
- Street spread or ponding
- By road class. Minor arterial and lower: 6 in or top of curb. Principal arterial: one lane open each way. (§3.2.1, Table 3.1)
City of Corpus Christi: Infrastructure Design Manual Chapter 3, March 2022
- Design frequency
- By road class: local and collector 5-year, arterial 25-year, highway and freeway 50-year. Underground: 5-year under 200 ac, 25-year 200 to 500 ac, 50-year over 500 ac. (§3.03 Level of Protection, Ch. 3 pp. 1-4)
- Detention release
- Post-development runoff released at no more than the pre-developed peak; no return periods in this rule. Regional detention may substitute. (§3.05, Ch. 3 p. 15)
- Minimum time of concentration
- None found in the parts we read.
- Street spread or ponding
- No width. Local: the 5-year must not pond across the roadway at inlets above the curb line. Arterial and highway: not across more than one lane. (§3.03, Ch. 3 pp. 1-2)
Harris County: Regulations of Harris County, Texas for the Approval and Acceptance of Infrastructure regulations updated October 10, 2023
- Design frequency
- Storm sewers on the 2-year rainfall in newly developed areas, with the hydraulic gradient below the gutter line. Redevelopment differs, and Houston guidelines also apply in its ETJ. (§6.02.2, pp. 27, 30)
- Detention release
- Not a pre-development rule: limited to the capacity allotted to the tract in the receiving sewer, or a share of a roadside ditch. HCFCD criteria prevail at an HCFCD channel. (§6.03.4, p. 42)
- Minimum time of concentration
- No minimum stated. Rational Method: Tc = 10 A0.1761 + 15 minutes, A in acres. (§6.02.1, p. 25)
- Street spread or ponding
- No spread limit. Extreme event ponding: 6 in above top of curb at high points, 18 in at low points. (§6.02.3, p. 34)
Travis County: Chapter 482. Travis County Development Regulations amendments through October 28, 2025
- Design frequency
- No stand-alone return period here: design meets the City of Austin Drainage Criteria Manual, which we did not read for this. (§482.207(b), p. 71)
- Detention release
- No numeric peak limit found. Prevent additional identifiable adverse flooding, and control the 2-year peak on site. (§482.207(a), p. 71)
- Minimum time of concentration
- None found in the parts we read.
- Street spread or ponding
- No limit found. Plans show the street ponding width for the 100-year. (§482.301, p. 109)
Fort Bend County: Drainage Criteria Manual manual revised 2011 and Interim Atlas 14 manual (2019, revised 2021)
- Design frequency
- No base return period stated. Added checks: 25-year grade line at the gutter for the part draining 100 to 200 ac, 100-year below natural ground over 200 ac. (§5.2.3, pp. 5-3, 5-4)
- Detention release
- Interim manual: not above pre-development discharges for the Atlas 14 10-year and 100-year (its text has a blank between them). Manual: under 50 ac, 0.125 cfs per acre in the 100-year. Date and project rules apply. (Interim §4, p. 4; §6.4.1, p. 6-3)
- Minimum time of concentration
- None found in the parts we read.
- Street spread or ponding
- No spread limit. Ponding in a new street in the 100-year: the lowest of 1 ft above natural ground, 1 ft above top of curb, or 1 ft below the lowest slab. (§5.4.1, p. 5-10)
Montgomery County: Montgomery County Drainage Criteria Manual September 2026 manual
- Design frequency
- Storm sewer 5-year up to 100 ac of cumulative service area, 100-year above it, with the grade line at or below the gutter flow line. (§5.1.1, p. 51; §5.2.1, p. 52)
- Detention release
- 5-, 10- and 100-year mitigated, with post-developed peaks below pre-developed. A simplified rate for 20 ac or less. Some small projects are exempt. (§6.2, p. 57; §6.3, pp. 59-66)
- Minimum time of concentration
- Minimum 10 minutes. (§2.2, p. 5)
- Street spread or ponding
- No spread limit. Ponding in the developed 100-year: the lowest of 12 in above top of curb, 1 ft below the lowest floor, or natural ground at the right-of-way. (§5.4.1, p. 55)
North Central Texas Council of Governments: iSWM Criteria Manual December 2009, revised 1/14/2015. Each city may change these
- Design frequency
- Streets, on-grade inlets and storm drain pipes: 25-year, 24-hour conveyance storm. Low points and right-of-way: 100-year, 24-hour. (Table 1.2, p. 5; §3.6.2)
- Detention release
- By option: modify downstream conveyance, show no downstream increase, or hold pre-development peaks on site. (§3.5.2, p. 30)
- Minimum time of concentration
- None found in the parts we read.
- Street spread or ponding
- Collectors, arterials and thoroughfares: 8 ft or one travel lane. Residential: curb depth or 6 in at the gutter. In the conveyance storm. (§3.6.2, Table 3.7)
A jurisdiction not listed here may still have criteria; ask its reviewing office. Tell us about a broken link or a newer edition.
Need an engineer’s review?
HERO E&C prepares drainage and floodplain studies, channel and culvert design, HEC-HMS / HEC-RAS models, and development permit applications across Texas.
A list of links for convenience, not engineering or legal advice. The documents belong to their publishers. HERO E&C · TBPELS Firm F-27793.